Operations
Chaos Test Suite (Gate 6)
Seven mandatory fault experiments against production-sized state.
One SRE week embedded inside shadow mode. Seven faults are injected against production-sized state; documented recovery times become the on-call runbook. All 7 must pass, signed off by the SRE lead — this is go-live Gate 6.
For each experiment document: injection method/script · preconditions (state size!) · pass criteria · rollback · evidence captured.